Concrete pavements
Road works
+48 34 360 9014 budpol@list.pl
  • Prefabrication Plant in Konin 2003-2005
  • Bricks, Pavers and Clay Blocks Plant in Gnaszyn 1999-2000
  • Bricks, Pavers and Clay Blocks Plant in Kupno 2009-2010
  • Road construction in Nowa Wieś Lęborska
  • Bricks, Pavers and Clay Blocks Plant in Oleśnica for Wienerberger 2007-2009
  • Road construction Piotrków Trybunalski – Rawa Mazowiecka 2011-2012
  • Surface macrograding at the International Katowice-Pyrzowice Airport 2008-2009
  • Concrete surface construction at Airproduct Częstochowa 2011-2012
  • Wide excavation at Cement Plant in Działoszyn 2012-2012
  • Mine extraction for a plant in Legnica 2003-2012
  • Mine extraction for a plant in Kupno 2003-2012
  • Mine extraction for a plant in Gnasyzn 2002-2012
  • Mine extraction for a plant in Honoratka 2000-2012
  • Mine extraction for a plant in Oleśnica 2009-2012
  • Mine extraction for a plant in Toruń 2004-2012
  • Mine extraction for a plant in Dobry 2004-2012
  • Mine extraction in Nowa Wieś Lęborska2009-2012
  • Mine extraction for a plant in Miedzianka 2004-2012
  • Mine extraction for a plant in Lębork 2009-2012
  • Infrastructure  odernization of a plant in Kunice 2012-2013
  • Storage Site construction in Nowa Wieś Lęborska 2012-2013
  • S8 Pawlikowice-Rzgów express road construction

The earthwork consisted largely in earthen structures that is excavations and embankments and of various shape and size as well as preparation of surfaces for further work. It also included vegetation layer removal, trees and shrubs removal, excavation works such as: rock loosening and excavation of material from the excavation sites and moving it to a given location, forming embankments and ground leveling.